Monday – Friday: 7am – 4pm
519-822-9905

Follow Us:

Bridge Work

The Brampton Boiler Project

The Brampton Boiler Project

The Brampton Boiler Project at Brampton Co-Generation Inc. The project consists of several mezzanines, access platforms, pipe supports, building reinforcing and three pipe bridges. The first phase of the bridge work is a 208’ clear span pipe bridge. It’s the longest and largest of the three pipe bridges.

Read more